Here we come to the stage of Building roof.. Yes, So far we have completed the following
stages:
1.Basement,
2.Building walls Up to Linden,
3. Linden Concrete
4. then walls again
5. Roof Concrete
So we posted the pic related to basement ground in the last
Post.
Let me explain in Detail; How we build Up to this stage
Constructed Beams to strength the Building & walls constructed
up to 10 feet, Used 15mm Steels with the Trusted brand to make our pillars so
strong
Building Walls is the next stage as we all Know; Used the
Bricks to build walls.
He we goes Our plan ;
Kitchen measures : 10*10
Dining Hall Measures:10*10
Master Bedroom Measures:16*10
Attached Toilet& bathroom Measures:8*5
Pooja Provision Done
Bedroom#2 Measures:10*11
Portiko Measures: 10*16
Outer Bathroom Near by Staircase Measures:5*4
Linden Concrete: It is done using the correct ratio of
cement & M-Sand, jalli
Again walls Upto 2.5 feet is constructed, then Roof Concrete
is done.
Meanwhile we have got PoweSupply, Borewell is fixed aound
450 feet with generous amount of water and PowerTech Pump submersimble one is
fixed to get the water.
We have constructed Sewage Tank and Water Tank as well;